WOSCA
Advance Right of Way Acquistion
This property consists of a full block, owned by a freight shipping cooperative, and is improved with approximately 120,000 sf of industrial space, as well as surface parking. Two acquisition scenarios were appraised, the first being acquisition of roughly half the site in fee, a 29,914 sf permanent utility easement and an eight year temporary construction easement. Under the second scenario, the entire property would be acquired in fee.
Seattle
Full block located in the Stadium District
7.8 acre property
120,000 sf GBA
Analysis of two scenarios for acquisition
For the SR-99: Alaskan Way Viaduct and Seawall Replacement Projec
Microsoft Interchange
Temporary and Permanent Acquistions
Acquisition for the development of a full diamond freeway interchange at NE 51st St and SR-520. Appraisals of the impacted properties consider all impacts of the acquisition, including underground easements and changes to access.
Redmond
Overlake
Microsoft Building
State Farm Building
Undeveloped lots
For SR-520 Improvement Project
Bremerton Ferry Tunnel
Eight Properties Impacted
Appraisal prior to right of way takings for the construction of a “cut and cover” tunnel providing traffic traveling off of the ferry with access out of Downtown Bremerton. Appraisal services including WSDOT “before and after” format reports on eight properties. Right of way acquisitions include subterranean easements; full and partial takings; utility, access, and temporary construction easements.
Bremerton
Waterfront
Eight properties totaling just under three acres